Trans Java Toll Road Will Be Completed Towards the End of 2018

Trans Java Toll Road Will Be Completed Towards the End of 2018

Semarang, 11 July 2018. PT Waskita Karya (Persero) Tbk as a contractor of Pemalang - Batang toll road project (39.20 km), and Batang - Semarang toll road project(75 km) received a working visit from the Minister of State Owned Enterprises (BUMN), Rini. M. Soemarno. In this occasion, the Minister of State Owned Enterprises was accompanied by Deputy of Financial Services Business, Survey Service, and Ministry of State Owned Enterprise Consultant, Gatot Trihargo, Deputy of Construction and Transportation Facilities and Facilities, Ahmad Bambang, Special Staff III Minister of SOE, Wianda Pusponegoro.

Toll Pejagan - Section Pemalang 1 and 2 are already operating 20.2 kilometers long, while Sections 3 and 4 have reached an average progress of 97.33%. In Lebaran 2018, section 3 and 4 functioned as homecoming route starting from H-10 Lebaran. The 3rd section of toll road covers Brebes Timur - Tegal along 10.40 kilometers and section of 4 segments of Tegal - Pemalang along 26.90 kilometers.

Batang Pemalang-Batang toll road is also functionally used in Lebaran 2018. This section consists of 2 (two) sections, namely Section 1 Pemalang - Pekalongan (21.15 km) has reached 79.45% progress and Section 2 Pekalongan - Batang 16.05 km) has reached 78.32% progress. The Pemalang-Batang Toll Road connects the Pemalang area with Batang, Central Java. This toll road is part of Trans Java Toll Road which will connect Merak, Banten to Banyuwangi, East Java.

The Batang-Semarang Toll Road, is a 75-kilometer toll road connecting Batang and Semarang, Central Java. This toll road is part of Trans Java Toll Road which will connect Merak, Banten to Banyuwangi, East Java. Progress until 26 June 2018 is 83.40%. The construction of this toll road is divided into 5 sections: Section 1 Batang - Kandeman (3.50 km), Section 2 Kandeman - Weleri (33.90 km), Section 3 Weleri - Ngampel (11.05 km)
Section 4 Ngampel - Kaliwungu (13.50 km), and Section 5 Kaliwungu - Krapyak (10.10 km).

In Batang - Semarang, there is a Kalikuto Bridge built with high technology and has a beautiful architecture that will become the icon of this toll road. In Lebaran 2018 Kalayaano bridge has been operated functionally for the flow back and forth.

Working visit of Minister of SOE Rini M. Soemarno accompanied by President Director of PT Waskita Karya (Persero) Tbk, I Gusti Ngurah Putra, President Director of PT Jasa Marga (Persero) Tbk, Desi Arryani.

Waskita Karya

Waskita Karya

Leave a message